This project includes the dismantling and relocation of the Solar PV system and its mounted structures from the existing site to a new site, along with complete installation and commissioning works.

Scope includes:

·        Site clearing, cleaning, and leveling

·        PCC casting for PV mounting structures

·        Installation of mounting structures and 220 PV panels

·        Conduit laying and electrical wiring

·        Supply and installation of 75 kW inverter

·        Testing and activation of existing booster pump

·        System testing and commissioning

·        End-user training for proper system operation

Duration: 24 December 2025 – 02 April 2026